Sunday, March 15, 2015

Driveway and Patios poured!

Stained and stamped concrete driveway.






Patio and walkways.




Tuesday, March 10, 2015

Driveway and Patio going in!

Stucco finished, Garage Doors installed.


Getting ready for concrete to be poured.






Drains installed around the property


Tile being installed






Hardwood floors, cabinets and granite installed.